Are you facing high chilled water cost or cooling issue?
iDCmini could be the best solution for high chilled water cost or cooling issue?
A little background…
Our client is a buying and a quality control company for the German head office. It is one of the largest German retailers, with a distribution network comprising around 950 own shops and more than 50,000 other points of sales. The products are also distributed in different European districts.
Reliability is his top focus when it comes to the decision of data center solution – since the network connection with headquarter cannot be interrupted.
Decision…
In this client’s revamp project, he deployed iDCmini solution (2 racks with 2 cooling units) for the server room in Tsim Sha Tsui. He has also added an open rack as a cabling rack.
The setup was completed within 2 days only.
This all-in-one data center solution helped to save a lot not only on renovation cost but also the operational cost in the long run.

“Huge cost saving saving on applying & running chilled water and renovation cost by using iDCmini. The payback period is just a few months.”
– Mr. Ronald Tse, IT Supervisor
A = Ronald
Q: What problem did you face before using iDCmini?
A: There are two main issues in regards to the cooling system:
High temperature: the office could reach 40°C in the weekend. We used a temporary cooling machine as a solution but it leaded to water leakage and heat backflow issue.
High cost of 7×24 chilled water: we had checked the cost of applying 24-hour cooling with property management office, the installation fee and monthly cost were just too high.
Therefore, we are very satisfied with how iDCmini solves both heat problem and 7×24 cooling at the same time. And most importantly, the payback period of iDCmini is just a few months!